State Road 87 Bridge

Milton Florida

Continuous high current flow was causing scaling and delamanation to the existing piles. All concrete repairs were performed and FRP structural jackets were installed. CPR also cleaned and sealed 254,000SF of the bridge decks with HMWM (High Molecular Weight Methacrylate) in accordance with FDOT spec section 413.